REQUEST A FREE ESTIMATE!

Full Name:

Phone:

Email:

I'm Interested In:



REQUEST A FREE ESTIMATE!

Full Name:

Phone:

Email:

I'm Interested In:

REQUEST A FREE ESTIMATE!

Full Name:

Phone:

Email:

I'm Interested In:

GAF Slateline Shingles

GAF Slateline Shingles in Emerald Green

GAF Slateline Shingles in Emerald Green

 

Bold shadow lines and tapered cut-outs create the look of slate at a fraction of the cost.

Contact Us to discuss color availability, product specifications and warranty details.

  • 10 Yr. Smart Choice® Protection
  • 130 mph Ltd. Wind Warranty
  • Listed Class A Fire – UL 790
  • Dade County Approved
  • Passes UL 997 modified to 130 mph
  • Passes ASTM D7158, Class H
  • ASTM D3161 Type 1, Class F
  • ASTM D3018 Type 1
  • ASTM D3462 Periodically tested by independent and internal labs to ensure compliance with ASTM D3462 at time of manufacture.
  • CSA A123.5-98
  • Florida Building Code Approved
  • Texas Department of Insurance
  • ICC ER-5466
  • NY MEA
  • Meets Wisconsin Administrative Code
  • 17”x40” size
  • Approx. 48 Pieces/Square
  • Approx. 3 Bundles/Square
  • Approx. 288 Nails/Square
  • 7 1/2” Exposure

GAF Slateline Shingles Color Options

GAF Slateline Shingles Color Options

Color Availability Varies By Region


GAF Shingles - Slateline

GAF Slateline Shingles bold shadow lines and tapered cut-outs create the look of slate at a fraction of the cost.

Roofing Company
Replacement Windows
Siding Replacement
Replacement Doors

What Our Customers Have to Say:

" Want to thank NUHome Roofing for an outstanding job! Interviewed several roofing companies and decided on NUHome based on Mike's (Salesperson) presentation. Mike pointed out the high standards NUHome was required to meet to comply with GAF continued endorsement of their product. Workers are trained to meet GAF standards and GAF continues testing and improving on their product. I learned about some new features in roofing which GAF introduced exclusively. Additionally, Mike told my wife and I that they were subjected to spot checks by GAF. The team that replaced our roof worked under extremely 'hot' conditions but they worked methodically, taking breaks when needed. The job took three days. At the end of each day, the team methodically cleaned up all debris and old roofing materials. First time in quite a while I can say I was fully pleased with a job I had done. We have a new, pleasing roof and I think of those dedicated men up there walking that steep roof and the conditions they had to work under. Most happy!" - Delbert Hardiman